午夜看片在线免费观看-午夜看一级特黄a-午夜理理伦a级毛片-午夜理理伦a级毛片天天看-午夜理伦三级在线观看-午夜理论

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16517

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 韩国黄色毛片 | 日本人妻仑乱少妇A级毛片潘金莲 | 天美传媒在线观看 | 亚洲日本精品中文字幕久久 | 日韩欧美国产精品啪啪视频 | 国产精品国产三级国av在线观看 | 欧美第八页 | 欧美一区二区三区久久综 | 亚洲欧美日韩精品久久亚洲区 | 亚洲免费观看在线美女视频 | 久久无码高潮喷水免费看 | 久久这里只有精品2 | 国产成人黄网址在线视频 | 免费又黄又爽A片免费看 | 久久久这里只有免费精品2024 | 日本护士做x视频 | 久久久久国产精品免费网站 | 亚洲欧美日韩国产精品26u | 国产亚洲欧美日本一二三本道 | 青草青草伊人精品视频一区二区三区国产美女在线播放 | 中文字幕欧美视频 | 纯肉小黄文高H | 中文字幕精品亚洲字幕资源网 | 国产极品JK白丝喷白浆在 | 97国产在线看片免费人成视频 | 亚洲欧美国产精品制服 | 亚洲av专区无码观看精品天堂 | 久久久精 | 女同精品一区二区网站 | 中文字幕 久久久 | 狠狠色噜噜狠狠狠狠69 | 久久99久久无码毛片一区二区 | 久久精品亚洲欧美日韩久久 | 岛国岛国免费V片在线观看 岛国电影一区二区三区口碑 | 一区二区久久久久草草 | 国产99最新在线 | 粉嫩AV久久一区二区三区 | 韩国和日本免费不卡在线 | 三级黃色男人的天堂 | 国产又爽又黄无码无遮挡在线观看 | 国产日韩欧美综合激情 |